Skip to end of metadata
Go to start of metadata

You are viewing an old version of this content. View the current version.

Compare with Current View Version History

« Previous Version 6 Next »

The wiring support for less than 16 monitors.

Wirings

Daisy Chain (In-out)

image-20241126-083000.png

Star

image-20241126-083413.png

Free runs

For free runs you can see the video:

https://youtu.be/kMTdMwHox3w

image-20241126-084002.png

Structure wiring

Use DH-BC4 instead of cable nuts/terminal block.

image-20241127-034858.png

what is BC-4 and how it works:

https://2easy-wiki.atlassian.net/wiki/x/HAAGgQ

Distance limitation

General

image-20241129-014623.png

Cable Type

A

B

∑(A+B) The sum Length*

2 x 0.75 mm²

60 M

90 M

200 M

2 x 1.00 mm²

75 M

100 M

220 M

UTP cable (4 + 4 Combine)

40 M

40 M

140 M

More specific

In the case of using cable 2 x 0.75 mm²

  • From the power supply to door stations (A), it is less than 75 meters.

  • From the power supply to monitors less than 90 meters.

  • Summation of cables less than 200 meters.

image-20241129-015756.png

Cable Type

1 or 2

3 or 4

1+2+3+4

2 x 0.75 mm²

60 M

90 M

200 M

  • No labels