Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

The wiring support for less than 16 monitors.

Wirings

Daisy Chain (In-out)

...

Star

...

Free runs

For free runs you can see the video:

...

image-20241126-084002.png

Structure

...

wiring

Use DH-BC4 instead of cable nuts/terminal block.

...

what is BC-4 and how it works:

...

Distance limitation

General

...

Cable Type

A

B

∑(A+B) The sum Length*

2 x 0.75 mm²

60 M

90 M

200 M

2 x 1.00 mm²

75 M

100 M

220 M

UTP cable (4 + 4 Combine)

40 M

40 M

140 M

More specific

In the case of using cable 2 x 0.75 mm²

  • From the power supply to door stations (A), it is less than 75 meters.

  • From the power supply to monitors less than 90 meters.

  • Summation of cables less than 200 meters.

...

Cable Type

1 or 2

3 or 4

1+2+3+4

2 x 0.75 mm²

60 M

90 M

200 M